Published records
All MassIDs.
Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.
Showing 1–20 of 274 results · Published MassIDs: 2,030
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 29, 2024 · dropped off Jan 31, 2024
Recorded mass
0.802 t
CO₂e reduced
0.400488 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 5, 2024 · dropped off Jan 10, 2024
Recorded mass
0.495 t
CO₂e reduced
0.247214 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 5, 2024 · dropped off Jan 10, 2024
Recorded mass
2.455 t
CO₂e reduced
1.126416 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 22, 2024 · dropped off Jan 22, 2024
Recorded mass
20.83 t
CO₂e reduced
4.650145 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 31, 2024 · dropped off Feb 1, 2024
Recorded mass
16.107 t
CO₂e reduced
1.066625 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 30, 2024 · dropped off Jan 30, 2024
Recorded mass
17.127 t
CO₂e reduced
3.823551 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 29, 2024 · dropped off Jan 30, 2024
Recorded mass
18.068 t
CO₂e reduced
4.033515 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 26, 2024 · dropped off Jan 29, 2024
Recorded mass
17.137 t
CO₂e reduced
3.825761 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 24, 2024 · dropped off Jan 25, 2024
Recorded mass
20.76 t
CO₂e reduced
4.634674 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 24, 2024 · dropped off Jan 24, 2024
Recorded mass
19.691 t
CO₂e reduced
4.395979 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 23, 2024 · dropped off Jan 24, 2024
Recorded mass
17.761 t
CO₂e reduced
3.965 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 22, 2024 · dropped off Jan 23, 2024
Recorded mass
18.355 t
CO₂e reduced
4.097609 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 19, 2024 · dropped off Jan 22, 2024
Recorded mass
18.988 t
CO₂e reduced
4.239058 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 18, 2024 · dropped off Jan 19, 2024
Recorded mass
18.652 t
CO₂e reduced
4.163913 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 15, 2024 · dropped off Jan 16, 2024
Recorded mass
18.038 t
CO₂e reduced
4.026884 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 15, 2024 · dropped off Jan 15, 2024
Recorded mass
16.939 t
CO₂e reduced
3.781558 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 12, 2024 · dropped off Jan 12, 2024
Recorded mass
20.493 t
CO₂e reduced
1.357046 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 11, 2024 · dropped off Jan 12, 2024
Recorded mass
16.771 t
CO₂e reduced
3.743986 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 10, 2024 · dropped off Jan 11, 2024
Recorded mass
20.948 t
CO₂e reduced
1.387203 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 10, 2024 · dropped off Jan 10, 2024
Recorded mass
18.988 t
CO₂e reduced
4.239058 t