Published records
All MassIDs.
Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.
Showing 1–20 of 2,030 results · Published MassIDs: 2,030
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 18, 2024 · dropped off Dec 20, 2024
Recorded mass
1.544 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 18, 2024 · dropped off Dec 20, 2024
Recorded mass
0.416 t
CO₂e reduced
0.20766 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 3, 2024 · dropped off Dec 4, 2024
Recorded mass
2.812 t
CO₂e reduced
0.627681 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 3, 2024 · dropped off Dec 4, 2024
Recorded mass
2.129 t
CO₂e reduced
0.97653 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Nov 9, 2024 · dropped off Nov 11, 2024
Recorded mass
2.396 t
CO₂e reduced
1.19652 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Nov 9, 2024 · dropped off Nov 11, 2024
Recorded mass
1 t
CO₂e reduced
0.458742 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 21, 2024 · dropped off Oct 23, 2024
Recorded mass
2.099 t
CO₂e reduced
0.962904 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 21, 2024 · dropped off Oct 23, 2024
Recorded mass
0.683 t
CO₂e reduced
0.341156 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 14, 2024 · dropped off Oct 16, 2024
Recorded mass
0.96 t
CO₂e reduced
0.479596 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 1, 2024 · dropped off Oct 2, 2024
Recorded mass
3.326 t
CO₂e reduced
0.742608 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 1, 2024 · dropped off Oct 2, 2024
Recorded mass
0.307 t
CO₂e reduced
0.153273 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Sep 20, 2024 · dropped off Sep 23, 2024
Recorded mass
2.049 t
CO₂e reduced
0.940194 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Sep 20, 2024 · dropped off Sep 23, 2024
Recorded mass
0.158 t
CO₂e reduced
0.079108 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 27, 2024 · dropped off Aug 28, 2024
Recorded mass
3.128 t
CO₂e reduced
0.698405 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 27, 2024 · dropped off Aug 28, 2024
Recorded mass
0.851 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 5, 2024 · dropped off Aug 6, 2024
Recorded mass
2.218 t
CO₂e reduced
1.017408 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 10, 2024 · dropped off Jun 11, 2024
Recorded mass
1.742 t
CO₂e reduced
0.799392 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 10, 2024 · dropped off Jun 11, 2024
Recorded mass
0.356 t
CO₂e reduced
0.177994 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 8, 2024 · dropped off Apr 9, 2024
Recorded mass
0.752 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 1, 2024 · dropped off Mar 6, 2024
Recorded mass
0.594 t
CO₂e reduced
0.296657 t