Published records
All MassIDs.
Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.
Showing 21–40 of 111 results · Published MassIDs: 2,030
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 15, 2024 · dropped off Feb 16, 2024
Recorded mass
19.978 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 15, 2024 · dropped off Feb 15, 2024
Recorded mass
6.405 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 15, 2024 · dropped off Feb 15, 2024
Recorded mass
14.84 t
CO₂e reduced
0.982711 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 15, 2024 · dropped off Feb 15, 2024
Recorded mass
20.166 t
CO₂e reduced
1.335412 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 15, 2024 · dropped off Feb 15, 2024
Recorded mass
15.078 t
CO₂e reduced
0.998445 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 15, 2024 · dropped off Feb 15, 2024
Recorded mass
21.315 t
CO₂e reduced
1.411459 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 15, 2024 · dropped off Feb 15, 2024
Recorded mass
15.206 t
CO₂e reduced
1.006967 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 15, 2024 · dropped off Feb 15, 2024
Recorded mass
21.236 t
CO₂e reduced
1.406213 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 14, 2024 · dropped off Feb 15, 2024
Recorded mass
15.602 t
CO₂e reduced
1.03319 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 14, 2024 · dropped off Feb 15, 2024
Recorded mass
20.612 t
CO₂e reduced
1.364913 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 14, 2024 · dropped off Feb 15, 2024
Recorded mass
18.889 t
CO₂e reduced
1.250842 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 12, 2024 · dropped off Feb 14, 2024
Recorded mass
16.295 t
CO₂e reduced
1.079081 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 12, 2024 · dropped off Feb 14, 2024
Recorded mass
19.691 t
CO₂e reduced
1.303944 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 12, 2024 · dropped off Feb 14, 2024
Recorded mass
14.028 t
CO₂e reduced
0.928954 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 12, 2024 · dropped off Feb 14, 2024
Recorded mass
21.74 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 12, 2024 · dropped off Feb 14, 2024
Recorded mass
15.612 t
CO₂e reduced
1.033846 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 12, 2024 · dropped off Feb 14, 2024
Recorded mass
21.711 t
CO₂e reduced
1.437682 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 12, 2024 · dropped off Feb 14, 2024
Recorded mass
14.86 t
CO₂e reduced
0.984022 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 12, 2024 · dropped off Feb 14, 2024
Recorded mass
20.552 t
CO₂e reduced
1.360979 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Feb 12, 2024 · dropped off Feb 14, 2024
Recorded mass
19.83 t
CO₂e reduced
Not measured yet