Published records
All MassIDs.
Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.
Showing 1–20 of 20 results · Published MassIDs: 2,030
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 1, 2024 · dropped off Mar 6, 2024
Recorded mass
0.594 t
CO₂e reduced
0.296657 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 1, 2024 · dropped off Mar 6, 2024
Recorded mass
2.633 t
CO₂e reduced
1.208172 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 26, 2024 · dropped off Mar 27, 2024
Recorded mass
18.068 t
CO₂e reduced
4.033515 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 26, 2024 · dropped off Mar 26, 2024
Recorded mass
18.533 t
CO₂e reduced
4.137392 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 26, 2024 · dropped off Mar 26, 2024
Recorded mass
18.404 t
CO₂e reduced
4.10866 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 22, 2024 · dropped off Mar 25, 2024
Recorded mass
19.087 t
CO₂e reduced
4.26116 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 21, 2024 · dropped off Mar 22, 2024
Recorded mass
16.394 t
CO₂e reduced
3.66 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 21, 2024 · dropped off Mar 21, 2024
Recorded mass
18.008 t
CO₂e reduced
4.020254 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 18, 2024 · dropped off Mar 19, 2024
Recorded mass
18.998 t
CO₂e reduced
4.241268 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 18, 2024 · dropped off Mar 18, 2024
Recorded mass
18.097 t
CO₂e reduced
4.040145 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 15, 2024 · dropped off Mar 18, 2024
Recorded mass
17.483 t
CO₂e reduced
3.903116 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 15, 2024 · dropped off Mar 15, 2024
Recorded mass
16.959 t
CO₂e reduced
3.785978 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 13, 2024 · dropped off Mar 14, 2024
Recorded mass
21.998 t
CO₂e reduced
4.910942 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 11, 2024 · dropped off Mar 12, 2024
Recorded mass
17.107 t
CO₂e reduced
3.819131 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 8, 2024 · dropped off Mar 11, 2024
Recorded mass
16.583 t
CO₂e reduced
3.701993 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 7, 2024 · dropped off Mar 8, 2024
Recorded mass
20.523 t
CO₂e reduced
4.581631 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 6, 2024 · dropped off Mar 6, 2024
Recorded mass
18.295 t
CO₂e reduced
4.084348 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 4, 2024 · dropped off Mar 4, 2024
Recorded mass
16.949 t
CO₂e reduced
3.783768 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 1, 2024 · dropped off Mar 4, 2024
Recorded mass
18.275 t
CO₂e reduced
4.079928 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 1, 2024 · dropped off Mar 2, 2024
Recorded mass
17.523 t
CO₂e reduced
3.911957 t