Skip to main content
Tera Ambiental

Published records

All MassIDs.

Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.

Showing 1–20 of 28 results · Published MassIDs: 2,030

  1. MassID

    Registered Dec 29, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 8, 2024 · dropped off Apr 9, 2024

    Recorded mass

    0.752 t

    CO₂e reduced

    0.375766 t

  2. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 30, 2024 · dropped off May 2, 2024

    Recorded mass

    19.642 t

    CO₂e reduced

    4.384928 t

  3. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 29, 2024 · dropped off Apr 30, 2024

    Recorded mass

    20.414 t

    CO₂e reduced

    4.557319 t

  4. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 29, 2024 · dropped off Apr 29, 2024

    Recorded mass

    19.097 t

    CO₂e reduced

    4.26337 t

  5. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 26, 2024 · dropped off Apr 29, 2024

    Recorded mass

    18.226 t

    CO₂e reduced

    1.206919 t

  6. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 26, 2024 · dropped off Apr 26, 2024

    Recorded mass

    21.295 t

    CO₂e reduced

    4.754022 t

  7. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 25, 2024 · dropped off Apr 26, 2024

    Recorded mass

    21.226 t

    CO₂e reduced

    4.738551 t

  8. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 24, 2024 · dropped off Apr 25, 2024

    Recorded mass

    20.968 t

    CO₂e reduced

    4.681087 t

  9. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 23, 2024 · dropped off Apr 24, 2024

    Recorded mass

    16.949 t

    CO₂e reduced

    3.783768 t

  10. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 22, 2024 · dropped off Apr 23, 2024

    Recorded mass

    18.384 t

    CO₂e reduced

    4.104239 t

  11. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 22, 2024 · dropped off Apr 22, 2024

    Recorded mass

    18.256 t

    CO₂e reduced

    4.075507 t

  12. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 19, 2024 · dropped off Apr 22, 2024

    Recorded mass

    18.612 t

    CO₂e reduced

    1.232486 t

  13. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 19, 2024 · dropped off Apr 19, 2024

    Recorded mass

    17.434 t

    CO₂e reduced

    3.892065 t

  14. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 18, 2024 · dropped off Apr 19, 2024

    Recorded mass

    18.355 t

    CO₂e reduced

    4.097609 t

  15. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 16, 2024 · dropped off Apr 17, 2024

    Recorded mass

    16.82 t

    CO₂e reduced

    3.755036 t

  16. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 16, 2024 · dropped off Apr 17, 2024

    Recorded mass

    20.107 t

    CO₂e reduced

    4.488805 t

  17. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 15, 2024 · dropped off Apr 16, 2024

    Recorded mass

    18.335 t

    CO₂e reduced

    4.093189 t

  18. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 12, 2024 · dropped off Apr 15, 2024

    Recorded mass

    17.949 t

    CO₂e reduced

    4.006993 t

  19. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 12, 2024 · dropped off Apr 12, 2024

    Recorded mass

    18.78 t

    CO₂e reduced

    4.192645 t

  20. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Apr 11, 2024 · dropped off Apr 12, 2024

    Recorded mass

    17.83 t

    CO₂e reduced

    3.980471 t