Published records
All MassIDs.
Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.
Showing 1–20 of 28 results · Published MassIDs: 2,030
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 8, 2024 · dropped off Apr 9, 2024
Recorded mass
0.752 t
CO₂e reduced
0.375766 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 30, 2024 · dropped off May 2, 2024
Recorded mass
19.642 t
CO₂e reduced
4.384928 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 29, 2024 · dropped off Apr 30, 2024
Recorded mass
20.414 t
CO₂e reduced
4.557319 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 29, 2024 · dropped off Apr 29, 2024
Recorded mass
19.097 t
CO₂e reduced
4.26337 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 26, 2024 · dropped off Apr 29, 2024
Recorded mass
18.226 t
CO₂e reduced
1.206919 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 26, 2024 · dropped off Apr 26, 2024
Recorded mass
21.295 t
CO₂e reduced
4.754022 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 25, 2024 · dropped off Apr 26, 2024
Recorded mass
21.226 t
CO₂e reduced
4.738551 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 24, 2024 · dropped off Apr 25, 2024
Recorded mass
20.968 t
CO₂e reduced
4.681087 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 23, 2024 · dropped off Apr 24, 2024
Recorded mass
16.949 t
CO₂e reduced
3.783768 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 22, 2024 · dropped off Apr 23, 2024
Recorded mass
18.384 t
CO₂e reduced
4.104239 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 22, 2024 · dropped off Apr 22, 2024
Recorded mass
18.256 t
CO₂e reduced
4.075507 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 19, 2024 · dropped off Apr 22, 2024
Recorded mass
18.612 t
CO₂e reduced
1.232486 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 19, 2024 · dropped off Apr 19, 2024
Recorded mass
17.434 t
CO₂e reduced
3.892065 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 18, 2024 · dropped off Apr 19, 2024
Recorded mass
18.355 t
CO₂e reduced
4.097609 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 16, 2024 · dropped off Apr 17, 2024
Recorded mass
16.82 t
CO₂e reduced
3.755036 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 16, 2024 · dropped off Apr 17, 2024
Recorded mass
20.107 t
CO₂e reduced
4.488805 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 15, 2024 · dropped off Apr 16, 2024
Recorded mass
18.335 t
CO₂e reduced
4.093189 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 12, 2024 · dropped off Apr 15, 2024
Recorded mass
17.949 t
CO₂e reduced
4.006993 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 12, 2024 · dropped off Apr 12, 2024
Recorded mass
18.78 t
CO₂e reduced
4.192645 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Apr 11, 2024 · dropped off Apr 12, 2024
Recorded mass
17.83 t
CO₂e reduced
3.980471 t