Published records
All MassIDs.
Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.
Showing 21–40 of 210 results · Published MassIDs: 2,030
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 6, 2024 · dropped off May 7, 2024
Recorded mass
21.067 t
CO₂e reduced
4.703189 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 6, 2024 · dropped off May 6, 2024
Recorded mass
20.552 t
CO₂e reduced
4.588261 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 3, 2024 · dropped off May 6, 2024
Recorded mass
18.84 t
CO₂e reduced
4.205906 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 3, 2024 · dropped off May 4, 2024
Recorded mass
21.018 t
CO₂e reduced
4.692138 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 3, 2024 · dropped off May 3, 2024
Recorded mass
20.523 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 2, 2024 · dropped off May 3, 2024
Recorded mass
18.761 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 20, 2024 · dropped off May 27, 2024
Recorded mass
18.711 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 27, 2024 · dropped off Jun 4, 2024
Recorded mass
13.068 t
CO₂e reduced
0.865362 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 27, 2024 · dropped off Jun 3, 2024
Recorded mass
16.602 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 27, 2024 · dropped off Jun 3, 2024
Recorded mass
16.345 t
CO₂e reduced
1.082358 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 27, 2024 · dropped off Jun 3, 2024
Recorded mass
15.781 t
CO₂e reduced
1.044991 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 27, 2024 · dropped off Jun 3, 2024
Recorded mass
14.068 t
CO₂e reduced
0.931576 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 27, 2024 · dropped off Jun 2, 2024
Recorded mass
8.415 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 27, 2024 · dropped off Jun 2, 2024
Recorded mass
16.088 t
CO₂e reduced
1.065314 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 27, 2024 · dropped off Jun 2, 2024
Recorded mass
13.87 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 27, 2024 · dropped off Jun 2, 2024
Recorded mass
16.662 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 27, 2024 · dropped off Jun 1, 2024
Recorded mass
5.316 t
CO₂e reduced
0.352045 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 27, 2024 · dropped off Jun 1, 2024
Recorded mass
19.345 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 27, 2024 · dropped off Jun 1, 2024
Recorded mass
14.533 t
CO₂e reduced
0.962388 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up May 27, 2024 · dropped off Jun 1, 2024
Recorded mass
13.019 t
CO₂e reduced
0.862085 t