Published records
All MassIDs.
Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.
Showing 1–20 of 212 results · Published MassIDs: 2,030
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 10, 2024 · dropped off Jun 11, 2024
Recorded mass
1.742 t
CO₂e reduced
0.799392 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 10, 2024 · dropped off Jun 11, 2024
Recorded mass
0.356 t
CO₂e reduced
0.177994 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 27, 2024 · dropped off Jun 28, 2024
Recorded mass
14.949 t
CO₂e reduced
0.989922 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 27, 2024 · dropped off Jun 27, 2024
Recorded mass
20.285 t
CO₂e reduced
4.528587 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 25, 2024 · dropped off Jun 26, 2024
Recorded mass
17.83 t
CO₂e reduced
3.980471 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 25, 2024 · dropped off Jun 25, 2024
Recorded mass
16.276 t
CO₂e reduced
1.07777 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 21, 2024 · dropped off Jun 25, 2024
Recorded mass
18.553 t
CO₂e reduced
4.141812 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 20, 2024 · dropped off Jun 21, 2024
Recorded mass
17.998 t
CO₂e reduced
4.018044 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 20, 2024 · dropped off Jun 20, 2024
Recorded mass
18.563 t
CO₂e reduced
4.144022 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 19, 2024 · dropped off Jun 20, 2024
Recorded mass
19.097 t
CO₂e reduced
4.26337 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 18, 2024 · dropped off Jun 19, 2024
Recorded mass
20.948 t
CO₂e reduced
4.676667 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 18, 2024 · dropped off Jun 18, 2024
Recorded mass
17.84 t
CO₂e reduced
3.982681 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 17, 2024 · dropped off Jun 18, 2024
Recorded mass
18.533 t
CO₂e reduced
4.137392 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 17, 2024 · dropped off Jun 17, 2024
Recorded mass
19.424 t
CO₂e reduced
4.336305 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 12, 2024 · dropped off Jun 13, 2024
Recorded mass
19.751 t
CO₂e reduced
4.409239 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 11, 2024 · dropped off Jun 12, 2024
Recorded mass
20.463 t
CO₂e reduced
4.56837 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 11, 2024 · dropped off Jun 11, 2024
Recorded mass
16.523 t
CO₂e reduced
3.688732 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 10, 2024 · dropped off Jun 11, 2024
Recorded mass
15.355 t
CO₂e reduced
1.016801 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 7, 2024 · dropped off Jun 10, 2024
Recorded mass
18.335 t
CO₂e reduced
4.093189 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jun 6, 2024 · dropped off Jun 7, 2024
Recorded mass
19.81 t
CO₂e reduced
4.4225 t