Published records
All MassIDs.
Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.
Showing 21–40 of 189 results · Published MassIDs: 2,030
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 26, 2024 · dropped off Aug 6, 2024
Recorded mass
19.058 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 26, 2024 · dropped off Aug 6, 2024
Recorded mass
20.721 t
CO₂e reduced
1.372124 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 26, 2024 · dropped off Aug 6, 2024
Recorded mass
16.503 t
CO₂e reduced
1.092848 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 26, 2024 · dropped off Aug 5, 2024
Recorded mass
15.612 t
CO₂e reduced
1.033846 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 26, 2024 · dropped off Aug 5, 2024
Recorded mass
17.256 t
CO₂e reduced
1.142672 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 26, 2024 · dropped off Aug 5, 2024
Recorded mass
15.256 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 26, 2024 · dropped off Aug 5, 2024
Recorded mass
19.018 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 26, 2024 · dropped off Aug 4, 2024
Recorded mass
15.236 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 30, 2024 · dropped off Aug 4, 2024
Recorded mass
17.751 t
CO₂e reduced
1.175451 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 30, 2024 · dropped off Aug 4, 2024
Recorded mass
12.89 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 30, 2024 · dropped off Aug 4, 2024
Recorded mass
18.464 t
CO₂e reduced
1.222652 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 30, 2024 · dropped off Aug 3, 2024
Recorded mass
10.583 t
CO₂e reduced
0.700812 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 30, 2024 · dropped off Aug 3, 2024
Recorded mass
9.811 t
CO₂e reduced
0.649677 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 30, 2024 · dropped off Aug 3, 2024
Recorded mass
19.543 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 30, 2024 · dropped off Aug 3, 2024
Recorded mass
13.811 t
CO₂e reduced
0.914531 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 30, 2024 · dropped off Aug 2, 2024
Recorded mass
8.138 t
CO₂e reduced
0.538885 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 30, 2024 · dropped off Aug 2, 2024
Recorded mass
15.602 t
CO₂e reduced
1.03319 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 30, 2024 · dropped off Aug 2, 2024
Recorded mass
13.741 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 30, 2024 · dropped off Aug 2, 2024
Recorded mass
17.771 t
CO₂e reduced
1.176761 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jul 30, 2024 · dropped off Aug 2, 2024
Recorded mass
13.781 t
CO₂e reduced
Not measured yet