Skip to main content
Tera Ambiental

Published records

All MassIDs.

Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.

Showing 1–20 of 189 results · Published MassIDs: 2,030

  1. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 31, 2024 · dropped off Aug 1, 2024

    Recorded mass

    20.196 t

    CO₂e reduced

    4.508696 t

  2. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 26, 2024 · dropped off Jul 29, 2024

    Recorded mass

    23.225 t

    CO₂e reduced

    5.185 t

  3. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 25, 2024 · dropped off Jul 26, 2024

    Recorded mass

    19.216 t

    CO₂e reduced

    4.289892 t

  4. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 23, 2024 · dropped off Jul 25, 2024

    Recorded mass

    18.365 t

    CO₂e reduced

    4.099819 t

  5. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 22, 2024 · dropped off Jul 23, 2024

    Recorded mass

    19.523 t

    CO₂e reduced

    4.358406 t

  6. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 18, 2024 · dropped off Jul 20, 2024

    Recorded mass

    17.018 t

    CO₂e reduced

    1.126938 t

  7. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 16, 2024 · dropped off Jul 17, 2024

    Recorded mass

    20.038 t

    CO₂e reduced

    4.473334 t

  8. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 15, 2024 · dropped off Jul 15, 2024

    Recorded mass

    17.226 t

    CO₂e reduced

    3.845652 t

  9. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 11, 2024 · dropped off Jul 12, 2024

    Recorded mass

    19.226 t

    CO₂e reduced

    4.292102 t

  10. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 11, 2024 · dropped off Jul 11, 2024

    Recorded mass

    21.245 t

    CO₂e reduced

    4.742971 t

  11. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 10, 2024 · dropped off Jul 10, 2024

    Recorded mass

    15.989 t

    CO₂e reduced

    3.569384 t

  12. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 8, 2024 · dropped off Jul 10, 2024

    Recorded mass

    13.335 t

    CO₂e reduced

    2.977065 t

  13. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 8, 2024 · dropped off Jul 8, 2024

    Recorded mass

    19.968 t

    CO₂e reduced

    4.457863 t

  14. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 5, 2024 · dropped off Jul 6, 2024

    Recorded mass

    18.84 t

    CO₂e reduced

    4.205906 t

  15. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 4, 2024 · dropped off Jul 4, 2024

    Recorded mass

    19.256 t

    CO₂e reduced

    4.298732 t

  16. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 3, 2024 · dropped off Jul 3, 2024

    Recorded mass

    23.918 t

    CO₂e reduced

    5.339711 t

  17. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 1, 2024 · dropped off Jul 2, 2024

    Recorded mass

    16.533 t

    CO₂e reduced

    3.690942 t

  18. MassID

    Registered Dec 19, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 1, 2024 · dropped off Jul 2, 2024

    Recorded mass

    16.8 t

    CO₂e reduced

    3.750616 t

  19. MassID

    Registered Aug 28, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 26, 2024 · dropped off Jul 31, 2024

    Recorded mass

    17.731 t

    CO₂e reduced

    1.17414 t

  20. MassID

    Registered Aug 27, 2025

    Material and methodology

    Organic waste

    BOLD Carbon (CH₄) · BOLD Recycling

    Role and treatment locality

    Network Integrator · Recycler

    JUNDIAI, SP · BR

    Picked up Jul 26, 2024 · dropped off Aug 6, 2024

    Recorded mass

    12.761 t

    CO₂e reduced

    0.84504 t