Published records
All MassIDs.
Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.
Showing 21–40 of 185 results · Published MassIDs: 2,030
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 7, 2024 · dropped off Aug 7, 2024
Recorded mass
19.087 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 6, 2024 · dropped off Aug 7, 2024
Recorded mass
20.166 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 5, 2024 · dropped off Aug 6, 2024
Recorded mass
21.335 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 2, 2024 · dropped off Aug 5, 2024
Recorded mass
19.671 t
CO₂e reduced
4.391558 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 1, 2024 · dropped off Aug 1, 2024
Recorded mass
19.82 t
CO₂e reduced
4.42471 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 10, 2024
Recorded mass
16.256 t
CO₂e reduced
1.076459 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 10, 2024
Recorded mass
20.305 t
CO₂e reduced
1.34459 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 10, 2024
Recorded mass
17.503 t
CO₂e reduced
1.159061 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 9, 2024
Recorded mass
14.563 t
CO₂e reduced
0.964355 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 9, 2024
Recorded mass
12.266 t
CO₂e reduced
0.812261 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 9, 2024
Recorded mass
8.455 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 9, 2024
Recorded mass
14.197 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 9, 2024
Recorded mass
10.256 t
CO₂e reduced
0.679178 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 8, 2024
Recorded mass
20.612 t
CO₂e reduced
1.364913 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 8, 2024
Recorded mass
15.355 t
CO₂e reduced
1.016801 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 8, 2024
Recorded mass
21.503 t
CO₂e reduced
1.423915 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 8, 2024
Recorded mass
15.028 t
CO₂e reduced
0.995167 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 8, 2024
Recorded mass
21.107 t
CO₂e reduced
1.397692 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 7, 2024
Recorded mass
5.544 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Sep 7, 2024
Recorded mass
17.612 t
CO₂e reduced
Not measured yet