Published records
All MassIDs.
Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.
Showing 1–20 of 185 results · Published MassIDs: 2,030
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 27, 2024 · dropped off Aug 28, 2024
Recorded mass
3.128 t
CO₂e reduced
0.698405 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 27, 2024 · dropped off Aug 28, 2024
Recorded mass
0.851 t
CO₂e reduced
0.425209 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 5, 2024 · dropped off Aug 6, 2024
Recorded mass
2.218 t
CO₂e reduced
1.017408 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 26, 2024 · dropped off Aug 26, 2024
Recorded mass
19.671 t
CO₂e reduced
4.391558 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 29, 2024 · dropped off Aug 29, 2024
Recorded mass
20.137 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 28, 2024 · dropped off Aug 28, 2024
Recorded mass
20.651 t
CO₂e reduced
4.610363 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 27, 2024 · dropped off Aug 27, 2024
Recorded mass
19.325 t
CO₂e reduced
4.314203 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 26, 2024 · dropped off Aug 26, 2024
Recorded mass
18.78 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 23, 2024 · dropped off Aug 23, 2024
Recorded mass
23.235 t
CO₂e reduced
5.187211 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 22, 2024 · dropped off Aug 22, 2024
Recorded mass
19.117 t
CO₂e reduced
4.26779 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 21, 2024 · dropped off Aug 22, 2024
Recorded mass
20.76 t
CO₂e reduced
4.634674 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 20, 2024 · dropped off Aug 21, 2024
Recorded mass
17.464 t
CO₂e reduced
3.898696 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 20, 2024 · dropped off Aug 20, 2024
Recorded mass
22.028 t
CO₂e reduced
4.917573 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 16, 2024 · dropped off Aug 19, 2024
Recorded mass
19.275 t
CO₂e reduced
4.303152 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 15, 2024 · dropped off Aug 16, 2024
Recorded mass
23.73 t
CO₂e reduced
5.297718 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 14, 2024 · dropped off Aug 14, 2024
Recorded mass
20.216 t
CO₂e reduced
4.513116 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 13, 2024 · dropped off Aug 14, 2024
Recorded mass
19.79 t
CO₂e reduced
4.41808 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 12, 2024 · dropped off Aug 13, 2024
Recorded mass
19.038 t
CO₂e reduced
4.250109 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 9, 2024 · dropped off Aug 9, 2024
Recorded mass
17.107 t
CO₂e reduced
3.819131 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 8, 2024 · dropped off Aug 9, 2024
Recorded mass
20.562 t
CO₂e reduced
4.590471 t