Published records
All MassIDs.
Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.
Showing 1–20 of 270 results · Published MassIDs: 2,030
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 21, 2024 · dropped off Oct 23, 2024
Recorded mass
2.099 t
CO₂e reduced
0.962904 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 21, 2024 · dropped off Oct 23, 2024
Recorded mass
0.683 t
CO₂e reduced
0.341156 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 14, 2024 · dropped off Oct 16, 2024
Recorded mass
0.96 t
CO₂e reduced
0.479596 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 1, 2024 · dropped off Oct 2, 2024
Recorded mass
3.326 t
CO₂e reduced
0.742608 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 1, 2024 · dropped off Oct 2, 2024
Recorded mass
0.307 t
CO₂e reduced
0.153273 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 29, 2024 · dropped off Oct 30, 2024
Recorded mass
20.948 t
CO₂e reduced
1.387203 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 29, 2024 · dropped off Oct 29, 2024
Recorded mass
20.82 t
CO₂e reduced
4.647935 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 29, 2024 · dropped off Oct 29, 2024
Recorded mass
21.404 t
CO₂e reduced
4.778334 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 25, 2024 · dropped off Oct 25, 2024
Recorded mass
17.592 t
CO₂e reduced
3.927428 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 25, 2024 · dropped off Oct 25, 2024
Recorded mass
18.295 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 23, 2024 · dropped off Oct 23, 2024
Recorded mass
23.374 t
CO₂e reduced
5.218153 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 23, 2024 · dropped off Oct 23, 2024
Recorded mass
22.503 t
CO₂e reduced
5.02366 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 18, 2024 · dropped off Oct 18, 2024
Recorded mass
25.918 t
CO₂e reduced
5.78616 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 18, 2024 · dropped off Oct 18, 2024
Recorded mass
24.651 t
CO₂e reduced
5.503261 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 16, 2024 · dropped off Oct 16, 2024
Recorded mass
23.423 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 16, 2024 · dropped off Oct 16, 2024
Recorded mass
25.166 t
CO₂e reduced
5.618189 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 15, 2024 · dropped off Oct 15, 2024
Recorded mass
15.573 t
CO₂e reduced
1.031224 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 11, 2024 · dropped off Oct 11, 2024
Recorded mass
20.83 t
CO₂e reduced
4.650145 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 11, 2024 · dropped off Oct 11, 2024
Recorded mass
21.75 t
CO₂e reduced
Not measured yetMaterial and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 9, 2024 · dropped off Oct 9, 2024
Recorded mass
20.84 t
CO₂e reduced
4.652355 t