Published records
All MassIDs.
Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.
Showing 1–20 of 174 results · Published MassIDs: 2,030
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 18, 2024 · dropped off Dec 20, 2024
Recorded mass
1.544 t
CO₂e reduced
0.708552 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 18, 2024 · dropped off Dec 20, 2024
Recorded mass
0.416 t
CO₂e reduced
0.20766 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 3, 2024 · dropped off Dec 4, 2024
Recorded mass
2.812 t
CO₂e reduced
0.627681 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 3, 2024 · dropped off Dec 4, 2024
Recorded mass
2.129 t
CO₂e reduced
0.97653 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 26, 2024 · dropped off Dec 27, 2024
Recorded mass
26.473 t
CO₂e reduced
1.753015 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 26, 2024 · dropped off Dec 27, 2024
Recorded mass
25.928 t
CO₂e reduced
5.78837 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 26, 2024 · dropped off Dec 27, 2024
Recorded mass
24.75 t
CO₂e reduced
5.525363 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 20, 2024 · dropped off Dec 23, 2024
Recorded mass
22.909 t
CO₂e reduced
5.114276 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 20, 2024 · dropped off Dec 23, 2024
Recorded mass
19.256 t
CO₂e reduced
4.298732 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 20, 2024 · dropped off Dec 23, 2024
Recorded mass
13.662 t
CO₂e reduced
0.904697 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 19, 2024 · dropped off Dec 19, 2024
Recorded mass
20.166 t
CO₂e reduced
4.502065 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 19, 2024 · dropped off Dec 19, 2024
Recorded mass
18.79 t
CO₂e reduced
4.194855 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 18, 2024 · dropped off Dec 18, 2024
Recorded mass
19.424 t
CO₂e reduced
4.336305 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 17, 2024 · dropped off Dec 17, 2024
Recorded mass
18.107 t
CO₂e reduced
4.042355 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 17, 2024 · dropped off Dec 17, 2024
Recorded mass
24.067 t
CO₂e reduced
5.372863 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 5, 2024 · dropped off Dec 6, 2024
Recorded mass
20.651 t
CO₂e reduced
4.610363 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 5, 2024 · dropped off Dec 6, 2024
Recorded mass
24.097 t
CO₂e reduced
5.379493 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 2, 2024 · dropped off Dec 3, 2024
Recorded mass
16.563 t
CO₂e reduced
3.697573 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 2, 2024 · dropped off Dec 3, 2024
Recorded mass
12.583 t
CO₂e reduced
2.809094 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 30, 2024 · dropped off Dec 31, 2024
Recorded mass
14.068 t
CO₂e reduced
0.931576 t