Published records
All MassIDs.
Each row shows a MassID published for this participant: its public identifier, dates, material, methodology, public role and treatment locality, and recorded mass.
Showing 21–40 of 2,030 results · Published MassIDs: 2,030
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Mar 1, 2024 · dropped off Mar 6, 2024
Recorded mass
2.633 t
CO₂e reduced
1.208172 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 29, 2024 · dropped off Jan 31, 2024
Recorded mass
0.802 t
CO₂e reduced
0.400488 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 5, 2024 · dropped off Jan 10, 2024
Recorded mass
0.495 t
CO₂e reduced
0.247214 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 5, 2024 · dropped off Jan 10, 2024
Recorded mass
2.455 t
CO₂e reduced
1.126416 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Jan 22, 2024 · dropped off Jan 22, 2024
Recorded mass
20.83 t
CO₂e reduced
4.650145 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Oct 29, 2024 · dropped off Oct 30, 2024
Recorded mass
20.948 t
CO₂e reduced
1.387203 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Aug 26, 2024 · dropped off Aug 26, 2024
Recorded mass
19.671 t
CO₂e reduced
4.391558 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 26, 2024 · dropped off Dec 27, 2024
Recorded mass
26.473 t
CO₂e reduced
1.753015 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 26, 2024 · dropped off Dec 27, 2024
Recorded mass
25.928 t
CO₂e reduced
5.78837 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 26, 2024 · dropped off Dec 27, 2024
Recorded mass
24.75 t
CO₂e reduced
5.525363 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 20, 2024 · dropped off Dec 23, 2024
Recorded mass
22.909 t
CO₂e reduced
5.114276 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 20, 2024 · dropped off Dec 23, 2024
Recorded mass
19.256 t
CO₂e reduced
4.298732 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 20, 2024 · dropped off Dec 23, 2024
Recorded mass
13.662 t
CO₂e reduced
0.904697 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 19, 2024 · dropped off Dec 19, 2024
Recorded mass
20.166 t
CO₂e reduced
4.502065 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 19, 2024 · dropped off Dec 19, 2024
Recorded mass
18.79 t
CO₂e reduced
4.194855 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 18, 2024 · dropped off Dec 18, 2024
Recorded mass
19.424 t
CO₂e reduced
4.336305 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 17, 2024 · dropped off Dec 17, 2024
Recorded mass
18.107 t
CO₂e reduced
4.042355 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 17, 2024 · dropped off Dec 17, 2024
Recorded mass
24.067 t
CO₂e reduced
5.372863 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 5, 2024 · dropped off Dec 6, 2024
Recorded mass
20.651 t
CO₂e reduced
4.610363 t
Material and methodology
Organic waste
BOLD Carbon (CH₄) · BOLD Recycling
Role and treatment locality
Network Integrator · Recycler
JUNDIAI, SP · BR
Picked up Dec 5, 2024 · dropped off Dec 6, 2024
Recorded mass
24.097 t
CO₂e reduced
5.379493 t