Verification did not pass.
20 rules ran against this MassID under BOLD Carbon (CH₄) 1.0.2.
One source. One method. One result.
This verification belongs to one MassID and one methodology version. A related certificate appears only when a public certificate exists for that same record and methodology.
No certificate linked
This failed run does not support certificate issuance.
A clear summary of the rule set.
Checks grouped by theme. Rule-level results remain in the published technical record.
This execution did not satisfy every required BOLD Carbon (CH₄) MassID rule. No emission-reduction result should be inferred from this run; the failed rule and its execution message remain available in the technical record.
- Record integrity and eligibility
- Identity, uniqueness, qualification and project-period requirements.
- Participants and locations
- Required actors, accreditations, origin and geographic precision.
- Transport and mass records
- Manifest, vehicle, weighing, drop-off and chain-of-custody evidence.
- Composting and methane-emission reduction
- Composting timeframe, final manifest and the methane-emission reduction calculation.
Technical record
Need the rule-by-rule history?
The published technical record preserves each execution's order, result, message, timestamp, checksum and source-code version.
The full record: events, participants and attachments, step by step.